{"id":1165,"date":"2025-11-24T17:13:10","date_gmt":"2025-11-24T13:43:10","guid":{"rendered":"https:\/\/almascatalyst.ir\/portfolio\/%d8%aa%d8%a8%d8%af%db%8c%d9%84-%d9%88%d8%a7%d8%ad%d8%af-%d8%b1%d9%81%d8%b1%d9%85%db%8c%d9%86%da%af-%d8%a8%d9%87-%d8%a7%db%8c%d8%b2%d9%88%d9%85%d8%b1%db%8c%d8%b2%d8%a7%d8%b3%db%8c%d9%88%d9%86\/"},"modified":"2025-12-29T14:19:29","modified_gmt":"2025-12-29T10:49:29","slug":"%d8%aa%d8%a8%d8%af%db%8c%d9%84-%d9%88%d8%a7%d8%ad%d8%af-%d8%b1%d9%81%d8%b1%d9%85%db%8c%d9%86%da%af-%d8%a8%d9%87-%d8%a7%db%8c%d8%b2%d9%88%d9%85%d8%b1%db%8c%d8%b2%d8%a7%d8%b3%db%8c%d9%88%d9%86","status":"publish","type":"portfolio","link":"https:\/\/almascatalyst.ir\/en\/portfolio\/%d8%aa%d8%a8%d8%af%db%8c%d9%84-%d9%88%d8%a7%d8%ad%d8%af-%d8%b1%d9%81%d8%b1%d9%85%db%8c%d9%86%da%af-%d8%a8%d9%87-%d8%a7%db%8c%d8%b2%d9%88%d9%85%d8%b1%db%8c%d8%b2%d8%a7%d8%b3%db%8c%d9%88%d9%86\/","title":{"rendered":"Conversion of reforming unit to isomerization \u2013 Fergana Refinery, Uzbekistan (SANEG \u2013 Uzbekistan)"},"content":{"rendered":"\n<p><strong>Challenge<\/strong><\/p>\n\n\n\n<p>For the first time in Central Asia, it was required to fully convert a catalytic reforming unit into an isomerization unit; a highly complex project demanding 100% redesign and engineering modification.<\/p>\n\n\n\n<p><strong>Almas Solution<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Full reverse engineering and process re-design<\/li>\n\n\n\n<li>Supply of 21,000 kg of specialized catalyst<\/li>\n\n\n\n<li>Training of engineering and operational teams<\/li>\n\n\n\n<li>Direct supervision until operational stability was achieved<\/li>\n<\/ul>\n\n\n\n<p><strong>Results<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Capacity: 4,000 barrels per day<\/li>\n\n\n\n<li>Gasoline quality: 81.5 RON in Through-Once mode<\/li>\n\n\n\n<li>First successful project of its kind in the region<\/li>\n\n\n\n<li>Contract extended for subsequent collaboration projects<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Challenge For the first time in Central Asia, it was required to fully convert a catalytic reforming unit into an<\/p>\n","protected":false},"featured_media":1166,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","project-cat":[],"class_list":["post-1165","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/portfolio\/1165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/comments?post=1165"}],"version-history":[{"count":1,"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/portfolio\/1165\/revisions"}],"predecessor-version":[{"id":1173,"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/portfolio\/1165\/revisions\/1173"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/media\/1166"}],"wp:attachment":[{"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/media?parent=1165"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/almascatalyst.ir\/en\/wp-json\/wp\/v2\/project-cat?post=1165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}